BE SURE TO ALSO VIEW THE INTERIOR PAGES FOR INFO ON INSIDE CABIN DETAILS, LIKE CONSOLE, STICK GRIPS, ETC

AUGUST, 2009 UPDATE - If you're going to be installing grips with switches, especially Infinity Aerospace grips that require mods to the stick, BE SURE to do this BEFORE INSTALLING THE CONTROL STICKS, not after you've installed the sticks.   See August interior page for details

Jan 26, 2005 update - If you are building a 7 or 9 with tipup canopy, there is a new service bulletin issued Jan 21, 2005.  It strengthens the way the aft end of the F632A channel attaches to the F706A bulkhead.   Click HERE to see the Service Bulletin.  For details regarding my F632A, see the MAY, 2004 details section.

Feb 10, 2003 - Received my QB wings and fuselage about a month early

Feb 13, 2003 - made stand for front of fuselage.  Mostly been focusing on wings.  See  wings page.

MARCH, 2003 details  seat backs  36.5 hours

APRIL 1-10, 2003 details  center tunnel, flaps control, rudder/brake pedals, elevator bellcrank & control rods, control sticks     87.5 hours

APRIL 11-20, 2003 details  control sticks, brake & rudder brackets, fuel valve, brake lines, gear mounts, elevator control rod  40.5 hours

MAY, 2003 details  baggage tiedowns, brake reservoir, brake lines  11.5 hours

JUNE, 2003 details  fuel lines, fuel vents, rudder cables, subpanel, fuel pump/cover  33.5 hours

JULY, 2003 details  fuel pump cover  1.5 hours

AUGUST, 2003 details  rear bulkhead, gear mounts, aileron trim, crotch strap mounts  43.5 hours

SEPTEMBER, 2003 details  aft bulkhead, custom baggage area  53.5 hours

OCTOBER, 2003 details  brake pedals  11.5 hours

NOVEMBER, 2003 details  new fuel control valve, brake fluid supply lines, redo fuel lines, fuel return lines  67.5 hours

DECEMBER, 2003 details  brake lines, fuel lines again, fuel tank attachments, aft bulkheads, covers, custom baggage rudder cable     41.75 hours

APRIL, 2004 details  custom baggage area, fuel tank brackets, rudder cable fairings, redo brake pedals, electric flap motor, cabin frame, instrument panel & subpanel   51.0 hours

MAY, 2004 details  cabin frame (roll bar)  90.25 hours

JUNE, 2004 details  autopilot elevator servo, cabin frame, custom baggage, subpanel, instrument panel  115.25 hours

JULY, 2004 details  instrument panel, baggage tiedowns  27.0 hours

MAY, 2005 details  gear legs, brakes, wheels, tires, subpanel  26.75 hours

JUNE, 2005 details  subpanel, firewall  11.25 hours

AUGUST, 2005 details  custom fuselage access panels  5.0 hours

SEPTEMBER, 2005 details  custom fuselage access panels, magnetometer mounts  32.5 hours

OCTOBER, 2005 details  magnetometer mounts, aft top skin, redo cabin frame brace, cabin lighting  24.75 hours

NOVEMBER, 2005 details  top fuse skin brace, cabin lighting  10.75 hours

JANUARY, 2006 details  subpanel  5.25 hours

May, 2006 - An email on the New England Van's list got me to thinking and worrying about my wing attach bolts.  The biggest problem is that I should have drilled out the wing bolt holes in the two main gear leg mount frames before I installed them.  Now, it's too late, and it's going to be quite tricky resolving that.  I emailed Van's about it, and got a comprehensive reply from Gus.  IMPORTANT NOTE - make damn sure you drill out your tri-gear main gear leg frames to match the wing mount bolt holes BEFORE you install the gear leg frames.  Otherwise, you will be very sorry.  0.5 hours

OCTOBER, 2006 details  fuel tank vent lines  5.0 hours

NOVEMBER, 2006 details  spar wing attach holes, console  12.5 hours

DECEMBER, 2006 details  console  42.25 hours

AUGUST, 2009 details - brake lines  6 hours

SEPTEMBER, 2009 details - bleed brakes

APRIL, 2010 details - clean up & fix apparent brake fluid leakage

 

 