BE SURE TO ALSO VIEW THE INTERIOR PAGES FOR INFO ON INSIDE CABIN DETAILS, LIKE CONSOLE, STICK GRIPS, ETC
AUGUST, 2009 UPDATE - If you're going to be installing grips with switches, especially Infinity Aerospace grips that require mods to the stick, BE SURE to do this BEFORE INSTALLING THE CONTROL STICKS, not after you've installed the sticks. See August interior page for details
Jan 26, 2005 update - If you are building a 7 or 9 with tipup canopy, there is a new service bulletin issued Jan 21, 2005. It strengthens the way the aft end of the F632A channel attaches to the F706A bulkhead. Click HERE to see the Service Bulletin. For details regarding my F632A, see the MAY, 2004 details section.
Feb 10, 2003 - Received my QB wings and fuselage about a month early
Feb 13, 2003 - made stand for front of fuselage. Mostly been focusing on wings. See wings page.
MARCH, 2003 details seat backs 36.5 hours
APRIL 1-10, 2003 details center tunnel, flaps control, rudder/brake pedals, elevator bellcrank & control rods, control sticks 87.5 hours
APRIL 11-20, 2003 details control sticks, brake & rudder brackets, fuel valve, brake lines, gear mounts, elevator control rod 40.5 hours
MAY, 2003 details baggage tiedowns, brake reservoir, brake lines 11.5 hours
JUNE, 2003 details fuel lines, fuel vents, rudder cables, subpanel, fuel pump/cover 33.5 hours
JULY, 2003 details fuel pump cover 1.5 hours
AUGUST, 2003 details rear bulkhead, gear mounts, aileron trim, crotch strap mounts 43.5 hours
SEPTEMBER, 2003 details aft bulkhead, custom baggage area 53.5 hours
OCTOBER, 2003 details brake pedals 11.5 hours
NOVEMBER, 2003 details new fuel control valve, brake fluid supply lines, redo fuel lines, fuel return lines 67.5 hours
DECEMBER, 2003 details brake lines, fuel lines again, fuel tank attachments, aft bulkheads, covers, custom baggage rudder cable 41.75 hours
APRIL, 2004 details custom baggage area, fuel tank brackets, rudder cable fairings, redo brake pedals, electric flap motor, cabin frame, instrument panel & subpanel 51.0 hours
MAY, 2004 details cabin frame (roll bar) 90.25 hours
JUNE, 2004 details autopilot elevator servo, cabin frame, custom baggage, subpanel, instrument panel 115.25 hours
JULY, 2004 details instrument panel, baggage tiedowns 27.0 hours
MAY, 2005 details gear legs, brakes, wheels, tires, subpanel 26.75 hours
JUNE, 2005 details subpanel, firewall 11.25 hours
AUGUST, 2005 details custom fuselage access panels 5.0 hours
SEPTEMBER, 2005 details custom fuselage access panels, magnetometer mounts 32.5 hours
OCTOBER, 2005 details magnetometer mounts, aft top skin, redo cabin frame brace, cabin lighting 24.75 hours
NOVEMBER, 2005 details top fuse skin brace, cabin lighting 10.75 hours
JANUARY, 2006 details subpanel 5.25 hours
May, 2006 - An email on the New England Van's list got me to thinking and worrying about my wing attach bolts. The biggest problem is that I should have drilled out the wing bolt holes in the two main gear leg mount frames before I installed them. Now, it's too late, and it's going to be quite tricky resolving that. I emailed Van's about it, and got a comprehensive reply from Gus. IMPORTANT NOTE - make damn sure you drill out your tri-gear main gear leg frames to match the wing mount bolt holes BEFORE you install the gear leg frames. Otherwise, you will be very sorry. 0.5 hours
OCTOBER, 2006 details fuel tank vent lines 5.0 hours
NOVEMBER, 2006 details spar wing attach holes, console 12.5 hours
DECEMBER, 2006 details console 42.25 hours
AUGUST, 2009 details - brake lines 6 hours
SEPTEMBER, 2009 details - bleed brakes
APRIL, 2010 details - clean up & fix apparent brake fluid leakage